Send Message
Home ProductsSteel Structure Workshop

Pharmaceutical PVC Windows Q235b Steel Structure Workshop

Certification
China Qingdao KaFa Fabrication Co., Ltd. certification
China Qingdao KaFa Fabrication Co., Ltd. certification
Customer Reviews
KAFA is a professional steel fabricator,The quality could match Aus standard. Good service.

—— Jonathon Dunlop

KAFA's engineer team is very great. Economical design and cost-effective plan helps us save much money. Thank you KAFA team!

—— Stephane

We cooperated with KAFA for more than 4 years, Good price, high quality, and most important is the on time delivery time. Especially the shop drawings drafting service, They can use Chinese material instead of Australian material properly.

—— James

I'm Online Chat Now

Pharmaceutical PVC Windows Q235b Steel Structure Workshop

Pharmaceutical PVC Windows Q235b Steel Structure Workshop
Pharmaceutical PVC Windows Q235b Steel Structure Workshop Pharmaceutical PVC Windows Q235b Steel Structure Workshop

Large Image :  Pharmaceutical PVC Windows Q235b Steel Structure Workshop

Product Details:
Place of Origin: Qingdao, China
Brand Name: KAFA
Certification: ISO 9001
Model Number: Steel workshop-014
Payment & Shipping Terms:
Minimum Order Quantity: 1000 square meter
Price: Negotiate
Packaging Details: Nude pack
Delivery Time: 30-45days
Payment Terms: L/C, T/T, Western Union
Supply Ability: 20000 square meter/month

Pharmaceutical PVC Windows Q235b Steel Structure Workshop

Description
Size: As Per Requirement Main Material: Q345b,Q235b
Wall: EPS, Glass Wool, Rock Wool, PU Sandwich Panel Or Single Sheet Roof: EPS, Glass Wool, Rock Wool, PU Sandwich Panel Or Single Sheet
Door: PVC Aluminum Sliding /roller Door. Color: As Your Request
Windows: PVC Aluminum Windows Frame: Weld Steel Structure Frame
Usage: Warehouse,workshop Life Time: 50 Years
High Light:

Q235b Steel Structure Workshop

,

PVC Windows Steel Structure Workshop

,

Pharmaceutical Prefab Steel Workshop

Steel structure workshop of pharmaceutical factory

Description
 
Light steel structure building is a new type of building structure system. It is formed by connecting H-shaped steel, Z-shaped steel and U-shaped steel components, roof and walls by using various panels and other components (such as windows) through the main steel frame. Doors, cranes, etc.
 
Features
 
1. Wide span: the maximum span clear distance of single span or multi span is 36M·without center pillar.
 
2. Low cost: According to customer requirements, the FOB unit price ranges from US$35 to US$70 per square meter.
 
3. Fast construction and easy installation.
4. Long-term service life: more than 50 years.
5. Other features: environmental protection, stable structure, earthquake resistance, waterproof, energy saving.
 
Technical Parameters
 
Description  
Main Components Base Concrete and steel foundation anchor bolts
Main frame Hot Rolled or Welded H-Section Steel
Material Q235B, Q345B or others as per client's requests
Purlin C/Z purlin: Size from C120~C320, Z100~Z320
Bracing X-type or other type, angle or round pipe
Bolt Plain or High-strength bolt
Roof & wall EPS / Rockwool / PU Sandwich panel or colored steel sheet
Door Electric flat door
Window Aluminum or PVC window
Surface Coating Anti-rust Paint or Hot Dip Galvanize
Sheet 0.3-0.8mm galvanized or color coated steel sheet
Accessories Translucent skylight sheet, Ventilators, etc.
PVC Down pipe, Galvanized / SS304 gutter, etc.
Usages 1. Workshop, warehouse, plant, storage
2. Steel web frame structure
3. High rise building project
4. Others steel structure buildings
Packing Main steel frame without packing load in 40' OT or 40'HQ
Roof and wall panel load in 40' HQ
Drawing By client or RPIC
Design Parameters If need design from Honkae, please supply following parameters:
1) Length, width, eave height, roof apex
2) Live Load, Wind Speed, Seismic Load, Snow Load etc.
4) Quantity and sizes for doors and windows
5) Other information if necessary
 
Use
 
1. Workshop warehouse
 
2. Steel web steel structure
 
3. Steel H beam and H pillar
 
4. Mast products
 
5. High-rise projects
 
6. Other steel structure buildings

 

Pharmaceutical PVC Windows Q235b Steel Structure Workshop 0

Installation and maintenance of steel structure workshop
 
Installation sequence of steel structure workshop:
 
Installation of steel columns→support between columns→temporary installation of steel suspension beams→roof beams, roof supports→correction and fixation of steel suspension beams→roof panels, wall panels→trim panels, waterproof panels, windows and doors installation.
 

maintenance:

 

All steel components in the steel structure workshop are connected together to form a closed structure. Therefore, the wires of the lighting equipment cannot be directly tied to the steel structure, and the wire tube or channel needs to be isolated from the steel structure, thereby avoiding electrical conduction.

 

For steel parts exposed outdoors, if the workshop is built for more than five years, the exposed structure must be painted and maintained. It can not only prevent parts from rusting, but also extend the service life of metal buildings.

 

After the installation is completed, the owner shall not change the original structure of the factory building. And can not increase or decrease the partition wall or any structural components. The owner needs to contact the steel structure manufacturer for advice. Only after professional calculation and judgment, the manufacturer can get the result of whether it can be modified.

 

Branches, leaves and similar items in the steel structure workshop should be removed in time to avoid unnecessary trouble caused by the backlog.

 

If the metal coating surface of the steel structure workshop is damaged, it should be repaired in time to prevent the surface of the metal plate from being exposed to sunlight and rain.

 

The cleanliness of the outer wall of the steel structure workshop mainly depends on the environment. When cleaning the surface, care must be taken to avoid scratches. Avoid using bleaching ingredients and abrasive cleaning products, such as steel wool and abrasion-resistant products. And rinse from top to bottom with clean water.

 

Pharmaceutical PVC Windows Q235b Steel Structure Workshop 1

 

Advantages of steel structure workshop
 

The steel structure workshop has the advantages of large span, light weight, low cost, heat preservation, energy saving, space saving, and good seismic performance. It is very suitable for building construction.

 

1) The steel structure workshop is sturdy and durable and can withstand heavy snow or earthquake. Our team will calculate according to your local wind and snow load, and then select the appropriate size and structure to ensure that your equipment has a service life of up to 50 years.

 

2) The prefabricated steel workshop is installed quickly. During the construction process, all components are manufactured in the factory and then shipped to the site for installation. No construction waste will be generated during construction. It is more environmentally friendly than traditional concrete structures and belongs to green buildings.

 

3) During installation, the cladding of the roof and the wall will overlap with no gaps. Insulation can add surface to ceilings and walls. The whole building is warm in winter and cold in summer, thus saving heat and air conditioning consumption and energy.

Contact Details
Qingdao KaFa Fabrication Co., Ltd.

Contact Person: Alice Lee

Tel: 0086 13969825647

Send your inquiry directly to us (0 / 3000)