Send Message
Home ProductsSteel Structure Workshop

ISO standard framework Clerestory Portal frame designed steel building workshop

Certification
China Qingdao KaFa Fabrication Co., Ltd. certification
China Qingdao KaFa Fabrication Co., Ltd. certification
Customer Reviews
KAFA is a professional steel fabricator,The quality could match Aus standard. Good service.

—— Jonathon Dunlop

KAFA's engineer team is very great. Economical design and cost-effective plan helps us save much money. Thank you KAFA team!

—— Stephane

We cooperated with KAFA for more than 4 years, Good price, high quality, and most important is the on time delivery time. Especially the shop drawings drafting service, They can use Chinese material instead of Australian material properly.

—— James

I'm Online Chat Now

ISO standard framework Clerestory Portal frame designed steel building workshop

ISO standard framework Clerestory Portal frame designed steel building workshop
ISO standard framework Clerestory Portal frame designed steel building workshop ISO standard framework Clerestory Portal frame designed steel building workshop ISO standard framework Clerestory Portal frame designed steel building workshop

Large Image :  ISO standard framework Clerestory Portal frame designed steel building workshop

Product Details:
Place of Origin: Qingdao, China
Brand Name: KAFA
Certification: ISO9000
Model Number: Steel structure workshop
Payment & Shipping Terms:
Minimum Order Quantity: 1000 square meter
Price: USD35~65/ sqm
Packaging Details: Nude pack or steel pallet
Delivery Time: 40 days after deposit and shop drawing confirmed
Payment Terms: L/C, T/T
Supply Ability: 20,000 square meter per Month

ISO standard framework Clerestory Portal frame designed steel building workshop

Description
Material: Welded H Beam, Hot Rolled H Beam, C/Z Purlin Surface Treatment: Alkyd Primer 80um
Wall: 0.5 Steel Corlor Sheet Roof: 0.5mm Steel Color Sheet
Dimension: 75*25*9m(length*width* Height) Door: Roller Shutter Automatic Door
Window: PVC Crane Capacity: 5Tons*2 Pcs
Wind Load: 150KM/h Ventilator: Clerestory
High Light:

Clerestory Steel Structure Workshop

,

Prefab Steel Workshop

,

ISO standard steel building workshop

ISO standard framework Clerestory Portal frame designed steel building workshop

 

Project name: Baoma industrial steel structure workshop  

Dimension:  75*25*9m(length*width*height)

Wall: 0.5 steel corlor sheet

Roof:0.5 steel corlor sheet

Ventilator: Clerestory

Total weight: 72ons 

Total value: 96,000usd 

Crane capcity: 2pcs*5Tons

 

ISO standard framework Clerestory Portal frame designed steel building workshop 0

 

>> Advantages:

 

1. Easy Installation

 

The steel frames are accurately engineered to fit simultaneously, with one end skidding into the other. No exceptional fasteners are required, and fewer employees are required to entire the process. No cutting, retaining, and hammering simultaneously long, hefty and bulky planks.

 

2. Favorable Cost

Since the steel is accurately slashed while manufacturing, there is no on location waste (no require to yield for somewhat longer timber to confirm they are long sufficient which you then slash down to size). Since fewer employees are required, that is less salaries to yield if you are having the construction gathered by somebody else.

 

3. Environmentally Friendly

Recyclable is an environmental benefit of steel buildings using in construction. Steel is the most recycled material in the world. Most manufacturers use recycled steel in all of their steel building materials.

 

4. Energy Saving

Energy efficiency is one element that points to an environmentally friendly building. Steel buildings fit this description in many different ways. Window placement, Tinted Windows, Insulated Frames, Vapor Retarders between the foundation and concrete slab.

 

5. Safe and resistant

 

Steel frame buildings are conspicuously more blaze resistant than a wood framed constructions, steel is furthermore unaffected by termites, bugs or rodents as well as mold or fungi. It does not have to be treated with chemicals like timber does, and a steel frame building is well grounded and less probable to be hit or impaired by lightning.

 

6. Improved construction quality

A steel frame building does not age and worsen like wooden structures manage over time, so as a homeowner you don’t have to concern about any feeble spots. Steel is corrosion resistant, it is dimensionally steady and it furthermore continues directly, no anxieties about distorting with climate changes.

 

7. Durability

Steel has one of the largest powers to heaviness ratios of any building material, so is large for a garage kit. Steel will not ever buckle, divide, distort, rotate, chink, rot or splinter. All this power, yet it is furthermore weighs less than timber, producing it simpler to handle, proceed round and construct with particularly when lifting partitions and roofs.

 

 

>> Specification:

 

Standard

GB50661 JGJ81 BS4592 ASM

JIS ISO

Size Customizable
Material Q235 / Q355 Welded H Beam and Hot Rolled Section Steel Grade Grade B
Design software CAD, PKPM, TEKLA Roof system Single steel sheet ,RW, EPS, PU,XPS,PF
Wall system Single steel sheet, RW,EPS, PU,XPS,PF Color Red,blue,white or customized
Durable Time 25-50 years Manufacturing Method Cutting,welding,painting,packing
Performance Durable ,widely using, anti-earthquarke, heat preservation, wind-resistance Application Field Plant, warehouse, office building, high-rise building, etc
UOM SQM FOB price US$15-45 per SQM
Supply Ability 20,000 sqm /month Delivery Time 30-45 days
Package Method In bulk or packed on steel pallet Customizale Service Available

 

>>Factors affecting the price of steel structure Building:

 

1. Raw material prices
Fluctuations in the price of steel have an important impact on the price of steel structure buildings. The increase in steel prices will directly cause the overall price of steel structure buildings to rise.

2. External load
External loads include wind load, snow load, dead load, and live load. Structural engineers calculate the steel structure based on the external load. If the load is large, the amount of steel used in the structure will increase.

3. The span of the steel frame
The larger span of the steel frame, the greater the amount of steel used per steel frame. More than 30 meters is considered a large width. If the steel frame has a large span and no center pillar, the amount of steel used will increase.

4. Structure
For steel structure buildings with cranes or mezzanine floors, to ensure the safe operation of cranes, steel columns will be increased, and columns of an equal cross-section will be adopted, which will increase the amount of steel used in the building.

Conclusion:
The amount of steel used plays a vital role in steel structure buildings. Therefore, structural engineers must optimize the structure as much as possible during the design process while ensuring safety, reducing the amount of steel used, and saving costs.

 

ISO standard framework Clerestory Portal frame designed steel building workshop 1

Contact Details
Qingdao KaFa Fabrication Co., Ltd.

Contact Person: Alice Lee

Tel: 0086 13969825647

Send your inquiry directly to us (0 / 3000)