Home ProductsSteel Structure Workshop

Anti Cyclone Steel Structure Workshop

Certification
China Qingdao KaFa Fabrication Co., Ltd. certification
China Qingdao KaFa Fabrication Co., Ltd. certification
Customer Reviews
KAFA is a professional steel fabricator,The quality could match Aus standard. Good service.

—— Jonathon Dunlop

KAFA's engineer team is very great. Economical design and cost-effective plan helps us save much money. Thank you KAFA team!

—— Stephane

We cooperated with KAFA for more than 4 years, Good price, high quality, and most important is the on time delivery time. Especially the shop drawings drafting service, They can use Chinese material instead of Australian material properly.

—— James

I'm Online Chat Now

Anti Cyclone Steel Structure Workshop

Anti Cyclone Steel Structure Workshop
Anti Cyclone Steel Structure Workshop Anti Cyclone Steel Structure Workshop Anti Cyclone Steel Structure Workshop

Large Image :  Anti Cyclone Steel Structure Workshop

Product Details:
Place of Origin: Qingdao China
Brand Name: KAFA
Certification: ISO 9001/2019
Model Number: KAFA WH-028
Payment & Shipping Terms:
Minimum Order Quantity: 400sqms
Packaging Details: In Nude
Delivery Time: 40days
Payment Terms: L/C, T/T
Supply Ability: 10000sqm/month

Anti Cyclone Steel Structure Workshop

Description
Material: H Beam, Steel Plate Round Bar Etc. Roof Panel: Colorbond Metal Sheet 0.7mm+ 100 Glasee Wool+0.4mm Metal Sheet
Wall: Brick Wall Windows: Aluminum Alloy
Steel Grade: Q345B&Q235B Anti-rusting: Epoxy Paint, DFT 90um
Wind Load: 280km/h Eaqual To 3.8kn/m2 Eaquake Reisitant: 8 Grade
Structure: Curvevd Roof Portal Steel Installation: 21 Days
High Light:

Anti Cyclone Steel Structure Workshop

,

Q345B Prefab Steel Workshop

Customer: Supper unic way 

 

1 Dimension: 48*40*(4.8~7.5)m

2 Roof panel: 0.7 PPGI seablue Color sheet +100mm glass wool+0.4 PPGI whitegrey color sheet

3 Surface treatment: Epoxy rich zinc primer+ Epoxy mia barrior middle paint, DFT 75um 

4 Wall: Concrete 

5 Span: 40m  

6 Cannopy: 5m length 

7 Wind load: 280km/h eaqual to 3.8kn/m2

8 Application: wedding hall 

9 Totall weight for steel structure: 118 Tons 

10 Total vaule: 160000usd 

12 Installation: By KAFA, It takes 21 days, 5 Technicans 

 

 

Big wind load is the unique techonology parameter. It is up to 280~300km/h , So during our design we have to neogociate that big wind load with architect. Heavy steel is the gurantee of safety.

 

The reason why we use steel building in Mauritius?

 

1 Long span without any middle column. Especially for the party centre and wedding hall. Large space without any middle column is very important. Traditional concrete structure can not meet with that request.

 

2 Lower cost. Concrete building will cost a lot of labors. and Especially in rain season. and Maritius equipments are very expensive, For example 25T crane is about 800usd/day.

 

3 Very quick installation, For this project, it is about 1920 sqms. Our 5 wokers takes 21 days finished all the project. Then customer could save a lot time to develop business but not take too much time for building.

 

4 Long time servise life, we can give a 50 years warrantty.

 

5 Safety, steel structure tenacity could have a good capacity to resist the huge wind.

 

 

Anti Cyclone Steel Structure Workshop 0Anti Cyclone Steel Structure Workshop 1Anti Cyclone Steel Structure Workshop 2

 

 

 

What we can do for you ? 

 

Proud of helping steel structure solutions:

  • High quality structural steel fabrication
  • Steel workshop&warehouse and other steel building designing Manufacturing and installation
  • prefabricated house designing manufacturing and installation
  • Container house designing manufacturing
  • Varies of steel sheet EPS etc. cladding system
  • Help windows and doors purchasing
  • Help installation

Our special service :

Quality control system

· Purchase material from famous steel manufacturer, supply traceable mill certificate.

· Before we use the material, we will make a third-party inspection,

· During fabricating, we have 5 QC to inspect every piece member.

· Before we load the steel into the container, we will arrange all the managers to

check the steel member.

· Project Supervisor from customer will be welcomed during our fabrication.

· Pre-assembly will be available to check the quality and connection.

Technology service

Help customer to replace the foreign material by chinese material , Modify the shop

drawings by chinese material ( but need your qualified engineer check and confirm)

· Modify and optimise shop drawings to save time and money.

· Help you quote your project by free

· Answer your other technology questiones

Loading management

· Before loading we will arrange all the managers to check the goods ( quality and quantity).

· We will make the loading container list before our loading

· We have one manager to check the quantity during our loading containers

· Tie up all the member in case the damage during the sea transportation

· After loading containers, Every steel member ( serial no. from your drawings) will be

marked in the loading container list, then we will send to you, you could check the

container list to find every member.

Installation

Supply full completed installation drawings and instructions

Send engineer to guide your erection

Installation technicians are available in your site

Contact Details
Qingdao KaFa Fabrication Co., Ltd.

Contact Person: henin

Send your inquiry directly to us (0 / 3000)