Home ProductsSteel Structure Workshop

Heavy Steel Structure Workshop Construction With Alkyd Primer Surface Treatment

Heavy Steel Structure Workshop Construction With Alkyd Primer Surface Treatment

    • Heavy Steel Structure Workshop Construction With Alkyd Primer Surface Treatment
    • Heavy Steel Structure Workshop Construction With Alkyd Primer Surface Treatment
    • Heavy Steel Structure Workshop Construction With Alkyd Primer Surface Treatment
  • Heavy Steel Structure Workshop Construction With Alkyd Primer Surface Treatment

    Product Details:

    Place of Origin: Qingdao, China
    Brand Name: KAFAFAB
    Certification: ISO
    Model Number: Steel structure workshop

    Payment & Shipping Terms:

    Minimum Order Quantity: 1000 square meter
    Price: 60~80usd/sqm
    Packaging Details: Nude pack or steel pallet
    Delivery Time: 40 days
    Payment Terms: L/C, T/T
    Supply Ability: 20000 square meter per Month
    Contact Now
    Detailed Product Description
    Material: Welded H Beam, Crane Beam, Purlin, Surface Treatment: Alkyd Primer
    Structure: Portal Structure Frame Wall: 0.5mm Steel Corlor Sheet+100mm Glass Wool+0.5mm Steel Corlor Sheet
    Roof: EPS 75MM Downpipe: 110mm Diameter, PVC
    Life Time: 50 Years Dimension: 116*65*14m
    Door: Sliding Door Window: Aluminum Windows

    Pre-engineered customized prefabricated steel structure building workshop

     

    Project site: Ethiopia

    Dimension: 116*65*14m( length*width* eave height) 

    Total weight: 232Tons 

    Total value:456,000usd 

    Fabrication time: 6weeks 

    Crane:   4*5tons, 2*20 tons 

     

     

    Heavy Steel Structure Workshop Construction With Alkyd Primer Surface Treatment

     

     
     
    Product Description
     

    Product Application

    Steel structure building is formed by the main framework through linking up the H beam, C purline, Z purline steel components. Roof and wall using a variety of panels together with other components such as windows and doors. The steel building has the advantages of wide span, high strength, light weight, low cost, temperature protection, save energy, beautiful appearance, short construction time, good effect of insulation, long using life, space-efficient, good seismic performance, flexible layout, etc.

    Heavy Steel Structure Workshop Construction With Alkyd Primer Surface Treatment
    SPECIFICATIONS FOR STEEL STRUCTURE BUILDING
     
    Item
    Material
    Description and surface process
     
    Main steel frame
    Column and Beam
    Q235 or Q345
    H section steel with two coats of mid-gray paint
    Purlin
    Q235 or Q345
    Galvanizd C or Z type steel
     


    Connecting

    Pieces
    Tie tube
    Q235
    Circular Tube with two coats of mid-gray paint
    Knee-Bracing
    Q235
    L50*4 Galvanizd angle steel
    Strutting piece
    Q235
    φ89*2.5 Galvanizd Circular Tube
    Column Bracing
    Q235
    Circular Tube with two coats of mid-gray paint
    Horizontal Bracing
    Q235
    Circular Tube with two coats of mid-gray paint
    Casing
    Q235
    φ30*2.5 Galvanized Circular Tube
     
     
    Door and Window
    Item
    Description
    Door
    Roller shutter door or Sliding door
    Window
    PVC Window or aluminum alloy window
     
     
     
    Other parts
    Ventilating device
    Fan,Ventilation window
    Bolt
    Foundation bolt,High strengthen bolt, Normal bolts
    Skylight
    Yx-840 Glass Fiber Reinforced Plastics
    Out/Inner ridge tile
    0.50mm Color sheet
    Crane beam
    Q235 or Q345 H section steel with two coats of mid-gray paint

    Main Features

    1)Enviromental friendly
    2) Lower cost and maintenance
    3) Long using time up to 50 years
    4) Stable and earthquake resistance up to 9 grade
    5) Fast construction, time saving and labor saving
    6) Good appearance

    Contact Details
    Qingdao KaFa Fabrication Co., Ltd.

    Contact Person: henin

    Send your inquiry directly to us (0 / 3000)

    Other Products