Send Message
Home ProductsSteel Structure Warehouse

Anti Seismic PRS Beam Galvanized Prefab Steel Warehouse

Certification
China Qingdao KaFa Fabrication Co., Ltd. certification
China Qingdao KaFa Fabrication Co., Ltd. certification
Customer Reviews
KAFA is a professional steel fabricator,The quality could match Aus standard. Good service.

—— Jonathon Dunlop

KAFA's engineer team is very great. Economical design and cost-effective plan helps us save much money. Thank you KAFA team!

—— Stephane

We cooperated with KAFA for more than 4 years, Good price, high quality, and most important is the on time delivery time. Especially the shop drawings drafting service, They can use Chinese material instead of Australian material properly.

—— James

I'm Online Chat Now

Anti Seismic PRS Beam Galvanized Prefab Steel Warehouse

Anti Seismic PRS Beam Galvanized Prefab Steel Warehouse
Anti Seismic PRS Beam Galvanized Prefab Steel Warehouse Anti Seismic PRS Beam Galvanized Prefab Steel Warehouse

Large Image :  Anti Seismic PRS Beam Galvanized Prefab Steel Warehouse

Product Details:
Place of Origin: Qingdao, China
Brand Name: KAFAFAB
Certification: ISO
Model Number: Steel structure workshop
Payment & Shipping Terms:
Minimum Order Quantity: 1000 square meter
Packaging Details: Nude pack or steel pallet
Delivery Time: 40 days
Payment Terms: L/C, T/T
Supply Ability: 20000 square meter per Month

Anti Seismic PRS Beam Galvanized Prefab Steel Warehouse

Description
Material: PRS Beam Surface Treatment: Hot Dip Galvanized
Structure: Portal Structure Frame Wall: 0.5mm Steel Corlor Sheet+100mm Glass Wool+0.5mm Steel Corlor Sheet
Roof: Corrugated Color Bone Roof Panel Downpipe: 110mm Diameter
Dimension: 120*60*9M(Length*width*eave Height) Steel Plate Type: Single Steel Plate
High Light:

Galvanized Prefab Steel Warehouse

,

PRS Beam Prefab Steel Warehouse

,

Anti Seismic Prefab Steel Warehouse

Hot-Dip Galvanized Single Steel Plate Steel Structure Warehouse

 

Steel structure warehouse advantages:

 

Fast build All general prefabricated warehouse come pre-welded, pre-drilled and pre-punched at our factory. just need to connect by bolts with the accuracy of steel components , no need to weld in construction site. One 1000 sqaure meter prefabricated warehouse just needs around 25 days to install with 5 workers.
Low cost Requires less maintenance than other traditional building method. Unit price range from FOB Qingdao USD19.99 to USD80 per square meter, it cost about 50% less than traditional construction. Moreover, 98% of all steel structure can be recycled into new steel products without reducing physical properties.
Anti-seismic and wind resistance Can withstand a grade 8 earthquake, wind resistance 300km/h.
Longer service time more than 50 years.
Health and safety cheap prefabricated warehouse is manufactured at the factory and rapid installation on the construction site by skilled personnel making steel structure safe. There is very little noise and dust.

 

 

Anti Seismic PRS Beam Galvanized Prefab Steel Warehouse 0

Items Specifications
Main Steel Frame Column Q235,Q345 Welded H Section Steel
Beam Q235,Q345 Welded H Section Steel
Secondary Frame Purlin Q235 C and Z Purlin
Knee Brace Q235 Angle Steel
Tie Rod Q235 Circular Steel Pipe
Brace Q235 Round Bar
Vertical & Horizontal support Q235 Angle Steel,Round Bar or Steel Pipe
Maintenance System Roof Panel

EPS , Glass Fiber , Rock Wool , Pu Sandwich Panel

Corrugated Steel Sheet

Wall Panel

EPS , Glass Fiber , Rock Wool , Pu Sandwich Panel

Corrugated Steel Sheet

Accessories Window Aluminum Window, Plastic Steel Window
Door Aluminum Door, Rolling Metal Door
Rainspout PVC
Fastener High Strengh Bolts,Normal Bolts,Chemical Bolts
Ventilation System Natural Ventilator,Ventilation Shutters
Live Load on Roof In 120kg Sqm (Color steel panel surrounded)
Wind Resistance Grade 12 Grades
Earthquake-Resistance 8 Grades
Structure Usage Up to 50 years
Temperature Suitable temperature -50°C~+50°C
Certification CE, SGS,ISO9001:2008,ISO14001:2004
Finishing Options Vast array of colors and textures available

 

 

The increasing popularity of steel warehouse construction can be attributed to the following:

 

1. They are quickly established


Since they have been pre-designed, the construction time of steel warehouses is shorter than that of conventionally constructed structures. Some of these components have been pre-cut and pre-drilled for easy assembly on the job site. Other work that has been done on site includes welding, sandblasting and painting. On average, steel structures can be completed at a rate of 1,000 to 1,500 square feet per day.

Assuming that the construction conditions are ideal, you can build the warehouse in just 10 days. Fast construction may ultimately mean an early return on investment.

Since the steel warehouse buildings are also prefabricated in the factory, you can be sure to avoid costly delays caused by weather and backlogs of materials.

 

2. Steel warehouse construction costs are lower


In fact, you can save 40-60% of material and labor costs. With the help of a few people, you can actually build the building yourself. Manuals are still provided. The cost per square foot (PSF) for warehouse buildings over 5,000 square feet is $7.50. If you want a cheaper option, you can choose Q-type Quonset buildings, which cost just over $5 per square foot. You can also benefit from the fact that they are lightweight, or their weight is almost half that of concrete.

 

3. They are flexible


Steel parts are versatile and can be customized to meet your space requirements and architectural design. You can easily modify, enhance and extend them. They can be designed to support wide-span beams to achieve a wide, protected layout, and can be easily constructed for future expansion. They can provide a clear span of 300' with various entry points for easy operation. The height can also be adjusted to adapt to bridge cranes that move large and tall objects. You can also choose to attach or build a separate office building.

Steel warehouse buildings can also be custom-designed for specific locations that are intended to be erected. Factors to consider before designing and conceptualizing are the snow, wind, and seismic loads specific to your site.

 

4. They are durable


No matter the design is simple or complex, one thing that cannot be compromised is the durability of the structure. The warehouse made of steel is very strong and can withstand extreme weather conditions such as hurricanes, strong winds, heavy snow, earthquakes and everything that nature brings. They also reduce the chance of fire.

 

5. Energy saving


Because you can use the steel warehouse building to control the temperature well, you can not only save money, but also maintain ideal storage conditions. Since they have been carefully prefabricated in the factory, the steel components can be assembled seamlessly to achieve better insulation and therefore energy efficiency. In addition to saving a lot of money in improving temperature and humidity control, you can also benefit from local government incentives for sustainable practices. Building permits are also easier to obtain for more sustainable and environmentally friendly solutions.

Contact Details
Qingdao KaFa Fabrication Co., Ltd.

Contact Person: Alice Lee

Tel: 0086 13969825647

Send your inquiry directly to us (0 / 3000)