Send Message
Home ProductsSteel Structure Workshop

Well Cladding Waterproof Industrial Portal Frame Steel Structure Workshop Solution

Certification
China Qingdao KaFa Fabrication Co., Ltd. certification
China Qingdao KaFa Fabrication Co., Ltd. certification
Customer Reviews
KAFA is a professional steel fabricator,The quality could match Aus standard. Good service.

—— Jonathon Dunlop

KAFA's engineer team is very great. Economical design and cost-effective plan helps us save much money. Thank you KAFA team!

—— Stephane

We cooperated with KAFA for more than 4 years, Good price, high quality, and most important is the on time delivery time. Especially the shop drawings drafting service, They can use Chinese material instead of Australian material properly.

—— James

I'm Online Chat Now

Well Cladding Waterproof Industrial Portal Frame Steel Structure Workshop Solution

Well Cladding Waterproof Industrial Portal Frame Steel Structure Workshop Solution
Well Cladding Waterproof Industrial Portal Frame Steel Structure Workshop Solution Well Cladding Waterproof Industrial Portal Frame Steel Structure Workshop Solution Well Cladding Waterproof Industrial Portal Frame Steel Structure Workshop Solution Well Cladding Waterproof Industrial Portal Frame Steel Structure Workshop Solution

Large Image :  Well Cladding Waterproof Industrial Portal Frame Steel Structure Workshop Solution

Product Details:
Place of Origin: Shandong, China
Brand Name: KAFA
Certification: ISO 9001:2015; ISO14001:2015; ISO45001:2018
Model Number: KAFA-2021040
Payment & Shipping Terms:
Minimum Order Quantity: 1000 square meter
Price: USD45~90 per square meter
Packaging Details: In nude or packed on steel pallet and loaded into 40' HQ/OT
Delivery Time: 6 weeks after shop drawing approval
Payment Terms: T/T, L/C
Supply Ability: 15,000 square meter per month

Well Cladding Waterproof Industrial Portal Frame Steel Structure Workshop Solution

Description
Application: Steel Workshop Type: Light,Heavy,steel Structure
Standard: GB Standard Material: Q355B/Q235B, Steel
Purlin: C/Z Section Galvanized Steel(Q235) Surface Treatment: Hot Dip Galvanised,two Primer And One Top Paint, DFT 70μm
Door: Sliding Door/Rolling Door/Swing Door Window: Aluminum Alloy Or Plastic Steel
Dimensions: Customers' Requirement Drawing Design: AutoCAD,PKPM,Tekla Structure
Service Life: 50 Years Roofing: Sandwich Panel, Single Steel Sheet
High Light:

Portal Frame Steel Structure Workshop

,

Well Cladding Steel Structure Workshop

,

Well Cladding portal frame steel structure

Well Cladding Waterproof Industrial Portal Frame Steel Structure Workshop Expert Solution

 

The steel structure workshop buildings use steel to form a load-bearing structure. Generally, the load-bearing structure called main frame, which are consist of beam, column and truss. The bracing system are including tie bar, knee bracing, staying bar, column bracing, as well as horizontal bracing. Together with roof system, wall system, and floor system, they are conforming an entire steel structure building.

 

Compared with traditional concrete buildings, metal workshop buildings apply steel plates or sectional steel instead of reinforced concrete, thus the workshop steel structure performs much higher strength, and better seismic resistance. Because of the components mostly being prefabricated in factories and assembled on-site, the construction period is greatly reduced. Due to the re-usability of steel, it can greatly reduce construction waste and become more environmentally friendly.

 

Well Cladding Waterproof Industrial Portal Frame Steel Structure Workshop Solution 0   Well Cladding Waterproof Industrial Portal Frame Steel Structure Workshop Solution 1

Specification of the Prefab Steel Structure Workshop Building

 

Dimension Length x Width x Eave height/ Ridge height
Frame type Portal frame, multi-story frame
Main frame Hot-rolled or Welded H beam and column, Q355B steel
Bracing components Tie bar, staying bar, Horizontal bracing, Column bracing
Cladding system Corrugated color steel sheet, sandwich panel with glass wool, rock wool,PU insulation
Accessory Ridge tile, trim, Gutter, Down pipe,skylight, clerestory
Door Sliding door, Roll up door, industrial section door, swing door
Window PVC window, aluminum window, metal louver

 

 

Advantages of Steel Structure Workshop

 

1. Easy to assemble

The steel components arriving at the construction site are all prefabricated. During the construction process, the installation work needs to layout each structure and erect it according to the installation drawing.

The installation sequence of the steel workshop building is:

First, install the steel columns and column cross-bracing and install roof beams and roof horizontal bracing. Finally, installs the purlin and enclosure structure.

 

2. Reasonable cost:
The steel structure workshop building is light in weight, reducing the basic cost, and the construction speed is fast. It can be completed and put into production as soon as possible. The overall economic benefits are much better than that of the concrete structure

 

3. Simple construction, short construction period.
The production and installation of steel structure usually involve processing all required components in the factory and then transporting to the construction site to assemble. So the construction period is greatly shortened. A 4000 square meter building can be basically installed in only 40 days.

 

4. Energy-saving and environmentally friendly
The corrugated color steel sheet and sandwich panels used in the prefab steel structure workshop are all energy-saving materials. The steel structure also adopts dry construction during the construction process to avoid dust and environmental pollution caused by concrete construction.

 

Design Important Factors

 

1. Reasonable column spacing

Steel structure buildings mainly apply H-section steel columns and steel beams. The spacing of H-section steel columns has a significant influence on the total quantity of steel used and the total cost. We usually apply economic column distance of 6.8m to 9m, based on the normal load of the structures.
As for the projects with special needs, that can be flexibly adjusted. The determination of building height should not only meet the requirements of production equipment and production operations but also consider the height of maintenance more comprehensively.

 

2. Proper lighting and ventilation design

As the enterprises adopt intensive production, the characteristics of large-span and large-space internal spaces are becoming more and more apparent. Therefore, steel building design should pay attention to lighting and ventilation design from the perspective of humanization and energy saving. When the workshop building is tall, the openable window at the bottom of the side exterior wall is used as the primary air inlet. By installing a roof ventilator, the ventilation and lighting problems are easily solved, and the actual operation is relatively simple.

 

Difference between steel structure building and concrete building

 

1.Short construction period

In terms of the construction cycle, the steel structure has obvious advantages. The construction of the steel structure building is very fast because it is prefabricated in the factory and assembled on the construction site. Only slight weld works need be applied on site.

 

2. Environmental Friendly

After transported to the construction site, the steel components only need to be hoisted and spliced. The whole process can be operated without water. There is no flying sand and a large amount of dust, which can reduce environmental pollution and impact on nearby residents.

 

3. Favorable Cost

Steel structure buildings save construction period and labor costs compared with concrete buildings. The total cost of a steel structure building roughly is 20%~30% lower than that of traditional concrete building. What’s more, steel structure is more robust and more durable than concrete.

 

4. Structure Weight

The steel structure itself has the characteristics of lightweight. The walls and roofs of the steel structure are made of light metal building materials, which are much lighter than the brick-concrete wall and roof.

 

  
Nearly 20 years of operating experience, KAFA has built our reputation by successfully implementing hundreds of projects in domestic and overseas. With a team of professionally trained engineers, KAFA always has complete solutions suitable for your project with a variety of choices from simple to complex including:
 
Pre-Engineered Steel Buildings
Buildings For Heavy Industry
Buildings for commodity industry
Industrial Steel Structures
 
Your satisfaction is our key success factor.
Contact us for the best solutions for your project!

 

Well Cladding Waterproof Industrial Portal Frame Steel Structure Workshop Solution 2

 

Well Cladding Waterproof Industrial Portal Frame Steel Structure Workshop Solution 3 Well Cladding Waterproof Industrial Portal Frame Steel Structure Workshop Solution 4Well Cladding Waterproof Industrial Portal Frame Steel Structure Workshop Solution 5  Well Cladding Waterproof Industrial Portal Frame Steel Structure Workshop Solution 6

 

Contact Details
Qingdao KaFa Fabrication Co., Ltd.

Contact Person: Alice Lee

Tel: 0086 13969825647

Send your inquiry directly to us (0 / 3000)