Project location: Marutitius
Dimension: 48m*40m*4.8m~7.5m
Roof system: 0.7mm PPGI seablue Color sheet +100mm glass wool+0.4mm PPGI whitegrey color sheet
Surface treatment: Epoxy rich zinc primer+ Epoxy mia barrior middle paint, DFT 75um
Wall: Concrete
Span: 40m
Cannopy: 5m length
Wind speed: 280km/h eaqual to windload 3.8kn/m2
Application: Wedding hall
Totall weight of steel structure: 118 Tons
Installation: By KAFA, It takes 21 days by 5 skilled workers.
Big wind load is the unique techonology parameter. It is up to 280~300km/h , So during our design we have to confirm that big wind load with architect. Heavy steel is the gurantee of safety.
The reason why we use steel building in Mauritius?
1 Long span without any middle column. Especially for the party centre and wedding hall. Large space without any middle column is very important. Traditional concrete structure can not meet with that request.
2 Lower cost. Concrete building will cost a lot of labors. and Especially in rain season. and Maritius equipments are very expensive, For example 25T crane is about 800usd/day.
3 Very quick installation, For this project, it is about 1920 sqms. Our 5 wokers takes 21 days finished all the project. Then customer could save a lot time to develop business but not take too much time for building.
4 Long time servise life, we can give a 50 years warrantty.
5 Safety, steel structure tenacity could have a good capacity to resist the huge wind.
Contact Person: Ms. Alice Lee
Tel: 0086 13969825647