Send Message
Home ProductsSteel Structure Construction

Long Span Horse Shed Steel Structure Construction For New Zealand Waikato

Certification
China Qingdao KaFa Fabrication Co., Ltd. certification
China Qingdao KaFa Fabrication Co., Ltd. certification
Customer Reviews
KAFA is a professional steel fabricator,The quality could match Aus standard. Good service.

—— Jonathon Dunlop

KAFA's engineer team is very great. Economical design and cost-effective plan helps us save much money. Thank you KAFA team!

—— Stephane

We cooperated with KAFA for more than 4 years, Good price, high quality, and most important is the on time delivery time. Especially the shop drawings drafting service, They can use Chinese material instead of Australian material properly.

—— James

I'm Online Chat Now

Long Span Horse Shed Steel Structure Construction For New Zealand Waikato

Long Span Horse Shed Steel Structure Construction For New Zealand Waikato
Long Span Horse Shed Steel Structure Construction For New Zealand Waikato
Long Span Horse Shed Steel Structure Construction For New Zealand Waikato Long Span Horse Shed Steel Structure Construction For New Zealand Waikato Long Span Horse Shed Steel Structure Construction For New Zealand Waikato Long Span Horse Shed Steel Structure Construction For New Zealand Waikato

Large Image :  Long Span Horse Shed Steel Structure Construction For New Zealand Waikato

Product Details:
Place of Origin: Qingdao, China
Brand Name: KAFA
Certification: ISO 9001
Model Number: Steel Building 02
Payment & Shipping Terms:
Minimum Order Quantity: 50T
Price: USD950~1100/T
Packaging Details: Nude pack or steel pallet
Delivery Time: 45 days after deposit
Supply Ability: 750T per month

Long Span Horse Shed Steel Structure Construction For New Zealand Waikato

Description
Material: Hot Rolled H Steel, Welded H Steel, Round Bar , Angle Steel Etc. Grade: Q355B, Q235B
Long Span: 40m Anti-corrosion System: Epoxy Rich Zinc Primer, DFT 125um
Quality Control: Inspectors On Line, UT Test Design Software: PKPM, Auto CAD, Tekla
Certificate: BV, ISO9001
High Light:

lightweight steel frame construction

,

prefabricated steel construction

 

Long Span Horse Shed Steel Structure Construction For New Zealand Waikato 0

 

New Zealand Waikato Horse Shed Steel Structure Construction

  • Project name: New Zealand Waikato Horse Shed

  • Supply scope: steel frame, Roof system

  • Steel quantity: 56 tons

  • Contract value: 60,000usd

  • Dimension: 30mL*40mW*6mH 

  • Roof system applys 0.5mm thickness color steel sheet and skylight sheet.

 
Long Span Horse Shed Steel Structure Construction For New Zealand Waikato 1

 

>>Specification

 

Item Materials Characteristics Material Grade Surface Treatment
Steel Column H shape,Box,Steel Pipe Q235B,Q345B Paint or Hot dip Galvanized
Steel beam H shape,Box,Steel Pipe Q235B,Q345B Paint or Hot dip Galvanized
Steel Bracing Steel Rod,Steel Pipe,Angle Steel Q235B,Q345B Paint or Hot dip Galvanized
Steel Purlin C or Z purlins(Thickness1.8mm~3.0mm) Q235B,Q345B Hot dip Galvanized
External Wall panels,Roof panels Single colorful corrugate steel sheet,sandwich panels with EPS,Rock wool,PU insulation Galvanized Steel+Painting Alu-zinc 150g,Fluorocarbon paint
Steel buildings Door Sliding door or Rolling door Steel or Aluminum sheet Paint or Hot dip galvanized
Steel buildings Windows Aluminum alloy-Glass,Aluminum alloy-shutter T=1.0-2.0mm Alloy
Skylighting panels FRP T=1.5mm-1.8mm Coefficient of thermal expansion:2.2x10-5/cm Light Tranmitar 85%
Ventilator Turbine ventilator on a ridge Steel,Stainless steel, PC Paint or Hot dip Galvanized
Gutter Galvanized steel plate,Stainless steel plate T=2.0mm Hot dip galvanized
Down pipe PVC pipe,color steel pipe Y=0.5mm Dia110mm  
Fasteners High strength bolt, Ordinary bolt 10.9S,4.8S Black, galvanized
Anchor bolts M24,M27,M30,M33,M39,M42 Q235A Steel

 
>>Advantage
 

Fast construction

Steel structure members are pre-welded, pre-drilled and pre-punched in our factory. Only need to connect by bolts with the accuracy of steel components, no need weld on construction field.
Only need 5 workers to assemble  one steel structure building of 1000 sqm within 25 days.

Affordable cost Require less maintenance than concrete building. Averagely, it cost about 50% less than traditional construction. Moreover, 98% of all steel structure can be recycled into new steel products without reducing physical properties.
Anti-seismic and wind resistance Can withstand grade 8 earthquake, wind resistance 300km/h.
Long service time More than 50 years.
Health and safety Steel structure building is manufactured at the factory and rapid installation on the construction site by skilled personnel making steel structure safe. There is very little noise and dust.

 

 

FAQ:


What is the steel materials for main frame

We apply high strength steel grade Q355B for the main frame  components, which ensure the strong and durable of the prefabricated metal structure buildings.

 

Why Prefab Metal Buildings lower than the concrete building

The materials of metal structure building higher than the concrete structure, but the prefab metal building fast and simple construction, the labor cost during installation, which much lower, so the overall cost of prefab metal structure building more economical than the concrete building.

Contact Details
Qingdao KaFa Fabrication Co., Ltd.

Contact Person: Alice Lee

Tel: 0086 13969825647

Send your inquiry directly to us (0 / 3000)