We apply high strength low calloy structural steel grade Q355B for the mainframe, which ensures the steel building frame strong and durable.
Product Details:
|
Dimension: | 180*50*8m (L*W*H) | Material: | H Beam Angle Steel Round Bar Etc. |
---|---|---|---|
Paint: | Alkyd Primer, DFT 80UM | Service Life: | 50 Years |
Blasting Grade: | Sa 2.5 | Roof: | EPS Sandwich Panel 75mm |
High Light: | steel building workshop,structural steel workshop |
Prefabricated Customized Portale Steel Structure Workshop South America
>> Characteristics:
Main Parts | Item Name | Specification |
Main Steel Frame | Steel Column |
Q235B, Q345B H shape, Box, Steel pipe, Hot rolled sheet |
Steel Beam |
Q235B, Q345B H shape, Steel Truss, Hot rolled sheet |
|
Supporting System | Brace |
Q235B, Q345B Steel rod, Steel pipe, Angle steel |
Roof Purlin | C or Z shape, Steel purlin | |
Wall Purlin |
Q235B, Q345B C or Z shape, Steel purlin |
|
Roof | Single colorful corrugate steel sheet, Sandwich panel with EPS, Rock wool, PU, Glass wool etc., | |
Wall | Single colorful corrugate steel sheet, Sandwich panel with EPS, Rock wool, PU, Glass wool etc., | |
Accessories | Bolts | Ordinary, High strength |
Gutter | Galvanized Steel plate, Stainless steel | |
Windows | Aluminum alloy-Glass, Aluminum alloy-shutter, PVC | |
Doors | Sliding or Rolling door | |
Downpipes | PVC pipe, Color steel pipe | |
Edge Cover | Made of color steel sheet thickness 0.5mm | |
Ventilator | Stainless steel | |
Crane | Crane in 5 tons to 20 tons |
>> Construction Advantage
Fast construction | Steel structure members are pre-welded, pre-drilled and pre-punched in our factory. Only need to connect by bolts with the accuracy of steel components, no need weld on construction field. Only need 5 workers to assemble one steel structure building of 1000 sqm within 25 days. |
Affordable cost | Require less maintenance than concrete building. Averagely, it cost about 50% less than traditional construction. Moreover, 98% of all steel structure can be recycled into new steel products without reducing physical properties. |
Anti-seismic and wind resistance | Can withstand grade 8 earthquake, wind resistance 300km/h. |
Long service time | More than 50 years. |
Health and safety | Steel structure building is manufactured at the factory and rapid installation on the construction site by skilled personnel making steel structure safe. There is very little noise and dust. |
>> Installation options:
There are 3 options of installation as following:
1. Clients install it by themselves according our construction drawings and online gaidance service.
2. Our engineer to help you on construction site.
3. We provide installation team to help.
We apply high strength low calloy structural steel grade Q355B for the mainframe, which ensures the steel building frame strong and durable.
> Why the overall construction cost of Prefabricated Metal Buildings is lower than the concrete building?
The steel material price is higher than concrete structure. But the prefabricated metal building can be constructed fastly and easily with lower labor cost. Thus, the overall cost of prefabrcated metal structure building is much more economical and favorable than the concrete building.