Product Details:
|
Material: | Welded H Beam, Hot Rolled H Beam, C/Z Purlin | Surface Treatment: | Alkyd Primer 80um |
---|---|---|---|
Wall System: | 0.7mm Thickness Waved Aluminum Sheet +100mm Thickness Glass Wool | Roof System: | 0.5mm Thickness Steel Color Sheet +100mm Thickness Glass Wool |
Dimension: | 72m*30m*12m (length*width* Height) | Door: | Roller Shutter Automatic Door |
Window: | Aluminum Alloy Window | Crane Capacity: | 5Tons * 2 Pcs |
Wind Load: | 150KM/h | Ventilator: | 5.5 Kw Dust Collector |
Highlight: | steel building workshop,structural steel workshop |
Prefabricated Double Storey Steel Structure Workshop with Office Room
Project name: Weiao heavy industrial steel structure workshop and office
Dimension: 72m*30m*12m (length*width*height)
Wall system: 0.7mm thickness waved aluminum sheet +100mm thickness glass wool
Roof system: 0.5mm thickness steel color sheet +100mm thickness glass wool
Ventilator: dust collector
Total steel weight: 66 Tons
Contract value: USD90,000
>> Advantages:
1. Easy Installation
The steel frames are accurately engineered to fit simultaneously, with one end skidding into the other. No exceptional fasteners are required, and fewer employees are required to entire the process. No cutting, retaining, and hammering simultaneously long, hefty and bulky planks.
Since the steel is accurately slashed while manufacturing, there is no on location waste (no require to yield for somewhat longer timber to confirm they are long sufficient which you then slash down to size). Since fewer employees are required, that is less salaries to yield if you are having the construction gathered by somebody else.
Recyclable is an environmental benefit of steel buildings using in construction. Steel is the most recycled material in the world. Most manufacturers use recycled steel in all of their steel building materials.
Energy efficiency is one element that points to an environmentally friendly building. Steel buildings fit this description in many different ways. Window placement, Tinted Windows, Insulated Frames, Vapor Retarders between the foundation and concrete slab.
5. Safe and resistant
Steel frame buildings are conspicuously more blaze resistant than a wood framed constructions, steel is furthermore unaffected by termites, bugs or rodents as well as mold or fungi. It does not have to be treated with chemicals like timber does, and a steel frame building is well grounded and less probable to be hit or impaired by lightning.
A steel frame building does not age and worsen like wooden structures manage over time, so as a homeowner you don’t have to concern about any feeble spots. Steel is corrosion resistant, it is dimensionally steady and it furthermore continues directly, no anxieties about distorting with climate changes.
Steel has one of the largest powers to heaviness ratios of any building material, so is large for a garage kit. Steel will not ever buckle, divide, distort, rotate, chink, rot or splinter. All this power, yet it is furthermore weighs less than timber, producing it simpler to handle, proceed round and construct with particularly when lifting partitions and roofs.
>> Specification:
Standard |
GB50661 JGJ81 BS4592 ASM JIS ISO |
Size | Customizable | ||||||||
Material | Q235 / Q355 Welded H Beam and Hot Rolled Section Steel | Grade | Grade B | ||||||||
Design software | CAD, PKPM, TEKLA | Roof system | Single steel sheet ,RW, EPS, PU,XPS,PF | ||||||||
Wall system | Single steel sheet, RW,EPS, PU,XPS,PF | Color | Red,blue,white or customized | ||||||||
Durable Time | 25-50 years | Manufacturing Method | Cutting,welding,painting,packing | ||||||||
Performance |
Durable ,widely using, anti-earthquarke, heat preservation, wind-resistance |
Application Field |
Plant, warehouse, office building, high-rise building, etc |
||||||||
UOM | SQM | FOB price | US$15-45 per SQM | ||||||||
Supply Ability | 20,000 sqm /month | Delivery Time | 30-45 days | ||||||||
Package Method | In bulk or packed on steel pallet | Customizale Service | Available |
Contact Person: Alice Lee