Product Details:
|
Size: | As Per Requirement | Main Material: | Q345b,Q235b |
---|---|---|---|
Wall: | EPS, Glass Wool, Rock Wool, PU Sandwich Panel Or Single Sheet | Roof: | EPS, Glass Wool, Rock Wool, PU Sandwich Panel Or Single Sheet |
Door: | PVC Aluminum Sliding /roller Door. | Color: | As Your Request |
Windows: | PVC Aluminum Windows | Frame: | Weld Steel Structure Frame |
Usage: | Warehouse,workshop | Life Time: | 50 Years |
Highlight: | Q345b Steel Building Workshop,Z320 Purlin Steel Building Workshop,0.8mm Galvanized Steel Structure Workshop |
Hot-dip galvanized waterproof steel structure workshop
The reason why steel structure workshops have become the mainstream choice for building workshops is.
Fast and flexible assembly. All components will be prefabricated in the factory and then shipped to the construction site. The installation process is quick and easy. |
Cost-effective. This will significantly shorten the construction cycle of the building, thereby saving a lot of time and money. |
High safety and durability. The steel structure is light in weight but high in strength and easy to maintain. It can be used for more than 50 years. |
High utilization rate. The steel structure is easy to move and move, and it can also be recycled without pollution. |
Optimize the design. The prefabricated steel workshop can be isolated from the outdoor environment and avoid leakage such as water seepage. It also has excellent fire resistance and corrosion resistance. |
Sturdy structure. The steel structure manufacturing workshop can withstand strong winds and heavy snow. It also has excellent seismic performance. |
Features of steel structure workshop
1. High material strength and light weight
2. Steel toughness, good plasticity, uniform material, high structural reliability
3. High degree of mechanization of steel structure manufacturing and installation
4. Good sealing performance of steel structure
5. Steel structure is heat-resistant and not fire-resistant
6. Poor corrosion resistance of steel structure
7. Low carbon, energy saving, green and environmental protection, reusable
Advantages:
1. Prefabricated: Fast and easy installation, save time and labor;
2. Customized design: different size, various layout, shape and appearance;
3. Light weight: lighter than concrete;
4. Removable
5. Environmental Friendly: recyclable, no waste produced;
6. High strength: can resistance grade 8 earthquake, water proof, fire proof, can resist strong wind and heavy snow.
7. Long life span: more than 50 years.
8. Wide span: single or multiple spans, maximum span 60m without middle columns.
Technical Parameters
Description | ||
Main Components | Base | Concrete and steel foundation anchor bolts |
Main frame | Hot Rolled or Welded H-Section Steel | |
Material | Q235B, Q345B or others as per client's requests | |
Purlin | C/Z purlin: Size from C120~C320, Z100~Z320 | |
Bracing | X-type or other type, angle or round pipe | |
Bolt | Plain or High-strength bolt | |
Roof & wall | EPS / Rockwool / PU Sandwich panel or colored steel sheet | |
Door | Electric flat door | |
Window | Aluminum or PVC window | |
Surface Coating | Anti-rust Paint or Hot Dip Galvanize | |
Sheet | 0.3-0.8mm galvanized or color coated steel sheet | |
Accessories | Translucent skylight sheet, Ventilators, etc. | |
PVC Down pipe, Galvanized / SS304 gutter, etc. | ||
Usages | 1. Workshop, warehouse, plant, storage | |
2. Steel web frame structure | ||
3. High rise building project | ||
4. Others steel structure buildings | ||
Packing | Main steel frame without packing load in 40' OT or 40'HQ | |
Roof and wall panel load in 40' HQ | ||
Drawing | By client or RPIC | |
Design Parameters | If need design from Honkae, please supply following parameters: | |
1) Length, width, eave height, roof apex | ||
2) Live Load, Wind Speed, Seismic Load, Snow Load etc. | ||
4) Quantity and sizes for doors and windows | ||
5) Other information if necessary |
1. Preparing Material⇒2. Cutting⇒3. Assembling⇒4. Automatic submerged arc welding⇒
5. Flange plate of straightening⇒6. Welding⇒7. Assembly dimensions inspecting⇒
8. nondestructive testing⇒9. shot blasting and descaling⇒10. Spray paint processing⇒
11. Measurement of coating thickness⇒12. Packaging⇒13. Delivery⇒Other: Secondary processing
Contact Person: Alice Lee
Tel: 0086 13969825647