|
Product Details:
|
Size: | As Per Requirement | Main Material: | Q345b,Q235b |
---|---|---|---|
Wall: | EPS, Glass Wool, Rock Wool, PU Sandwich Panel Or Single Sheet | Roof: | EPS, Glass Wool, Rock Wool, PU Sandwich Panel Or Single Sheet |
Door: | PVC Aluminum Sliding /roller Door. | Color: | As Your Request |
Windows: | PVC Aluminum Windows | Frame: | Weld Steel Structure Frame |
Usage: | Warehouse,workshop | Life Time: | 50 Years |
High Light: | Q235 Steel Structure Workshop,H Section Steel Structure Workshop,EPS Roof Steel Structure Warehouse |
H section Q235 steel structure workshop
Steel structure workshop
The steel structure workshop is a new type of building structure system. This architectural structure system is a main body composed of columns and beams, and a frame structure composed of steel components such as H-shaped steel, C-shaped pur strip, Z-shaped pur strip and U-shaped pur strip.
The roof and walls use various panels and other components (such as doors and windows) to form a closed system. The advantages of steel structure buildings are wide application range, high span, high strength, light weight, low cost, temperature protection, energy saving, beautiful appearance, short construction time, good insulation effect, long service life, space saving, and good seismic performance. Flexible layout etc.
We can provide customized solutions according to your requirements. Different styles of materials can be used for roof and wall panels, doors and windows, which can provide a unique solution for your workshop construction.
Technical Parameters
Description | ||
Main Components | Base | Concrete and steel foundation anchor bolts |
Main frame | Hot Rolled or Welded H-Section Steel | |
Material | Q235B, Q345B or others as per client's requests | |
Purlin | C/Z purlin: Size from C120~C320, Z100~Z320 | |
Bracing | X-type or other type, angle or round pipe | |
Bolt | Plain or High-strength bolt | |
Roof & wall | EPS / Rockwool / PU Sandwich panel or colored steel sheet | |
Door | Electric flat door | |
Window | Aluminum or PVC window | |
Surface Coating | Anti-rust Paint or Hot Dip Galvanize | |
Sheet | 0.3-0.8mm galvanized or color coated steel sheet | |
Accessories | Translucent skylight sheet, Ventilators, etc. | |
PVC Down pipe, Galvanized / SS304 gutter, etc. | ||
Usages | 1. Workshop, warehouse, plant, storage | |
2. Steel web frame structure | ||
3. High rise building project | ||
4. Others steel structure buildings | ||
Packing | Main steel frame without packing load in 40' OT or 40'HQ | |
Roof and wall panel load in 40' HQ | ||
Drawing | By client or RPIC | |
Design Parameters | If need design from Honkae, please supply following parameters: | |
1) Length, width, eave height, roof apex | ||
2) Live Load, Wind Speed, Seismic Load, Snow Load etc. | ||
4) Quantity and sizes for doors and windows | ||
5) Other information if necessary |
maintenance:
All steel components in the steel structure workshop are connected together to form a closed structure. Therefore, the wires of the lighting equipment cannot be directly tied to the steel structure, and the wire tube or channel needs to be isolated from the steel structure, thereby avoiding electrical conduction.
For steel parts exposed outdoors, if the workshop is built for more than five years, the exposed structure must be painted and maintained. It can not only prevent parts from rusting, but also extend the service life of metal buildings.
After the installation is completed, the owner shall not change the original structure of the factory building. And can not increase or decrease the partition wall or any structural components. The owner needs to contact the steel structure manufacturer for advice. Only after professional calculation and judgment, the manufacturer can get the result of whether it can be modified.
Branches, leaves and similar items in the steel structure workshop should be removed in time to avoid unnecessary trouble caused by the backlog.
If the metal coating surface of the steel structure workshop is damaged, it should be repaired in time to prevent the surface of the metal plate from being exposed to sunlight and rain.
The cleanliness of the outer wall of the steel structure workshop mainly depends on the environment. When cleaning the surface, care must be taken to avoid scratches. Avoid using bleaching ingredients and abrasive cleaning products, such as steel wool and abrasion-resistant products. And rinse from top to bottom with clean water.
The steel structure workshop has the advantages of large span, light weight, low cost, heat preservation, energy saving, space saving, and good seismic performance. It is very suitable for building construction.
1) The steel structure workshop is sturdy and durable and can withstand heavy snow or earthquake. Our team will calculate according to your local wind and snow load, and then select the appropriate size and structure to ensure that your equipment has a service life of up to 50 years.
2) The prefabricated steel workshop is installed quickly. During the construction process, all components are manufactured in the factory and then shipped to the site for installation. No construction waste will be generated during construction. It is more environmentally friendly than traditional concrete structures and belongs to green buildings.
3) During installation, the cladding of the roof and the wall will overlap with no gaps. Insulation can add surface to ceilings and walls. The whole building is warm in winter and cold in summer, thus saving heat and air conditioning consumption and energy.
Contact Person: Alice Lee
Tel: 0086 13969825647