Product Details:
|
Application: | Steel Workshop | Type: | Light,Heavy,steel Structure |
---|---|---|---|
Standard: | GB Standard | Material: | Q355B/Q235B, Steel |
Purlin: | C/Z Section Galvanized Steel(Q235) | Surface Treatment: | Hot Dip Galvanised,two Primer And One Top Paint, DFT 70μm |
Roofing: | Sandwich Panel, Single Steel Sheet | Door: | Sliding Door/Rolling Door/Swing Door |
Window: | Aluminum Alloy Or Plastic Steel | Dimension: | Customers' Requirement |
Drawing Design: | AutoCAD,PKPM,Tekla Structure | Service Life: | 50 Years |
High Light: | TEKLA Modeling Steel Frame Workshop,Steel Frame Workshop With Colorful Cladding,TEKLA Modeling metal frame workshop |
TEKLA Modeling Industrial Metal Workshop Building With Colorful Cladding And Roofing Sheet
The steel structure workshop buildings use steel to form a load-bearing structure. Generally, the load-bearing structure called main frame, which are consist of beam, column and truss. The bracing system are including tie bar, knee bracing, staying bar, column bracing, as well as horizontal bracing. Together with roof system, wall system, and floor system, they are conforming an entire steel structure building.
Compared with traditional concrete buildings, metal workshop buildings apply steel plates or sectional steel instead of reinforced concrete, thus the workshop steel structure performs much higher strength, and better seismic resistance. Because of the components mostly being prefabricated in factories and assembled on-site, the construction period is greatly reduced. Due to the re-usability of steel, it can greatly reduce construction waste and become more environmentally friendly.
Specification of the Prefab Steel Structure Workshop Building
Dimension | Length x Width x Eave height/ Ridge height |
Frame type | Portal frame, multi-story frame |
Main frame | Hot-rolled or Welded H beam and column, Q355B steel |
Bracing components | Tie bar, staying bar, Horizontal bracing, Column bracing |
Cladding system | Corrugated color steel sheet, sandwich panel with glass wool, rock wool,PU insulation |
Accessory | Ridge tile, trim, Gutter, Down pipe,skylight, clerestory |
Door | Sliding door, Roll up door, industrial section door, swing door |
Window | PVC window, aluminum window, metal louver |
Advantages of Steel Structure Workshop
1. Easy to assemble
The steel components arriving at the construction site are all prefabricated. During the construction process, the installation work needs to layout each structure and erect it according to the installation drawing.
The installation sequence of the steel workshop building is:
First, install the steel columns and column cross-bracing and install roof beams and roof horizontal bracing. Finally, installs the purlin and enclosure structure.
2. Reasonable cost:
The steel structure workshop building is light in weight, reducing the basic cost, and the construction speed is fast. It can be completed and put into production as soon as possible. The overall economic benefits are much better than that of the concrete structure
3. Simple construction, short construction period.
The production and installation of steel structure usually involve processing all required components in the factory and then transporting to the construction site to assemble. So the construction period is greatly shortened. A 4000 square meter building can be basically installed in only 40 days.
4. Energy-saving and environmentally friendly
The corrugated color steel sheet and sandwich panels used in the prefab steel structure workshop are all energy-saving materials. The steel structure also adopts dry construction during the construction process to avoid dust and environmental pollution caused by concrete construction.
Design Important Factors
1. Reasonable column spacing
Steel structure buildings mainly apply H-section steel columns and steel beams. The spacing of H-section steel columns has a significant influence on the total quantity of steel used and the total cost. We usually apply economic column distance of 6.8m to 9m, based on the normal load of the structures.
As for the projects with special needs, that can be flexibly adjusted. The determination of building height should not only meet the requirements of production equipment and production operations but also consider the height of maintenance more comprehensively.
2. Proper lighting and ventilation design
As the enterprises adopt intensive production, the characteristics of large-span and large-space internal spaces are becoming more and more apparent. Therefore, steel building design should pay attention to lighting and ventilation design from the perspective of humanization and energy saving. When the workshop building is tall, the openable window at the bottom of the side exterior wall is used as the primary air inlet. By installing a roof ventilator, the ventilation and lighting problems are easily solved, and the actual operation is relatively simple.
Difference between steel structure building and concrete building
1.Short construction period
In terms of the construction cycle, the steel structure has obvious advantages. The construction of the steel structure building is very fast because it is prefabricated in the factory and assembled on the construction site. Only slight weld works need be applied on site.
2. Environmental Friendly
After transported to the construction site, the steel components only need to be hoisted and spliced. The whole process can be operated without water. There is no flying sand and a large amount of dust, which can reduce environmental pollution and impact on nearby residents.
3. Favorable Cost
Steel structure buildings save construction period and labor costs compared with concrete buildings. The total cost of a steel structure building roughly is 20%~30% lower than that of traditional concrete building. What’s more, steel structure is more robust and more durable than concrete.
4. Structure Weight
The steel structure itself has the characteristics of lightweight. The walls and roofs of the steel structure are made of light metal building materials, which are much lighter than the brick-concrete wall and roof.
Nearly 20 years of operating experience, KAFA has built our reputation by successfully implementing hundreds of projects in domestic and overseas. With a team of professionally trained engineers, KAFA always has complete solutions suitable for your project with a variety of choices from simple to complex including:
Pre-Engineered Steel Buildings
Buildings For Heavy Industry
Buildings for commodity industry
Industrial Steel Structures
Your satisfaction is our key success factor.
Contact us for the best solutions for your project!
Contact Person: Alice Lee
Tel: 0086 13969825647